Commercial rooftop solar EPC contractors
9 contractors document rooftop solar projects on commercial or institutional buildings in this directory. Open the named reference to see the site, contractor role and reported solar capacity before you send your scope.
Project references
- Advanced Green Technologies Orange County Convention Center Rooftop Solar Upgrade · FL · 2.2 MWdc
- Ameresco Snell Library rooftop solar installation · MA · 0.15778 MWdc
- Continental Energy Solutions Magid Glove & Safety Solar Microgrid · IL · 3.46 MW (basis unstated)
- Core Development Group Extra Space Storage rooftop portfolio
- Dynamic Energy Barrette Outdoor Living Galloway Rooftop Solar · NJ · 2.097 MW (basis unstated)
- Elite Electric Jack in the Box San Diego · CA
- Paradise Energy Solutions Messick’s Farm Equipment Rooftop Solar · PA · 1.07 MW (basis unstated)
- PowerFlex ASICS Byhalia Distribution Center – Second Rooftop Array · MS · 1 MW (basis unstated)
- Veregy Abraham Lincoln Capital Airport Solar · IL · 2.88 MW (basis unstated)
Put the roof membrane, warranty, structural loads and building operating hours into your brief early.
Include your project state, target MWac or MWdc, mounting type, storage scope and notice-to-proceed window.
Request solar EPC quotes
One brief, several replies: Solar EPC Contractors forwards it to the contractors that fit and they answer you directly.
Brief received by Solar EPC Contractors. Matching contractors reply to your inbox.
We couldn't send your request through Solar EPC Contractors. Check your email address and try again, or write to hello@solarepccontractors.com.
Buyer questions
What belongs in a commercial rooftop quote request?
Include roof type, warranty, age, structural drawings and the metering arrangement. Add access windows and outage limits if the facility must stay open.
Do carports count as rooftop references?
Building-mounted arrays qualify for this list. Carports stand on separate structures and appear under their own configuration on contractor profiles.
How do I compare arrays on different roofs?
Start with the mounting system, roof constraints and the DC capacity of the array. Then compare how each firm handled site access and electrical tie-ins.